MicroCore Systems Canada

 
Roof Top
Back Print Page Email Page
 

Roof Top



151 Front pre-engineered the placement of a network of structural steel to support the added weight and vibration of a capacity rooftop in full operation. Upon approval by the Ministry of Environment, 151 Front currently houses 18 generators strategically placed throughout the penthouse and rooftop. To facilitate tenant requirements for secondary cooling, a similar structural steel complex was installed on the upper most roof to accommodate the vast array of condensers, fluid coolers, glycol pumps and chillers.

| Back to Top |

Home | About Us | Enhanced Voice Solutions | Facilities Overview | Telephone Systems | TELUS| Careers | Contact Us